Power-Gen International 2012 – December 11-13, 2013 – Orlando, FL
Project Background – Boiler Retrofit:
Project was based to be an emission reduction project
- Retrofit existing boilers with ultra low emission technology
- Minimize costs
- Installation
- Operation
- Maintenance
Retrofit Project
- Keep project as simple as possible
- Two new Zeeco Free-Jet Ultra Low NOx gas burners
- Reused existing windbox
- Updated controls philosophy and lower balanced draft point
- Balance combustion air to each burner